1915 Çanakkale Bridge
Basic information
Road suspension bridge in the province of Çanakkale in northwestern Turkey.
The number 1915 in the name, the height of intersection point of main cable (318 m),] and the groundbreaking date (18 March) are related to the Ottoman naval victory on 18 March 1915 during the naval operations in the Gallipoli Campaign.
The deck carries six lanes of motorway (three in each direction), together with two walkways on each side for maintenance
The total length of the bridge is 3,563 m (11,690 ft) and together with the approach viaducts the length reaches 4,608 m (15,118 ft), main span of 2,023 m (6,637 ft)
The height of the bridge's two towers is 318 m (1,043 ft), the bridge is the sixth tallest bridge in the world
Construction start 2017, construction end 26.02.2022
- 13 days from now, December 20, 2025, 1915 Çanakkale Bridge celebrate 2nd Mars age
- 28 days from now, January 4, 2026, 1915 Çanakkale Bridge celebrate exactly 2,000,000 minutes
- 39 days from now, January 16, 2026, 1915 Çanakkale Bridge celebrate exactly 200 weeks
- 47 days from now, January 23, 2026, 1915 Çanakkale Bridge celebrate 16th Mercury age
- 101 days from now, March 18, 2026, 1915 Çanakkale Bridge celebrate 4th birthday
- 135 days from now, April 21, 2026, 1915 Çanakkale Bridge celebrate 17th Mercury age
- 139 days from now, April 26, 2026, 1915 Çanakkale Bridge celebrate exactly 1,500 days
- 162 days from now, May 18, 2026, 1915 Çanakkale Bridge celebrate exactly 50 months
- 212 days from now, July 7, 2026, 1915 Çanakkale Bridge celebrate 7th Venus age
- 223 days from now, July 18, 2026, 1915 Çanakkale Bridge celebrate 18th Mercury age