1915 Çanakkale Bridge
Basic information
Road suspension bridge in the province of Çanakkale in northwestern Turkey.
The number 1915 in the name, the height of intersection point of main cable (318 m),] and the groundbreaking date (18 March) are related to the Ottoman naval victory on 18 March 1915 during the naval operations in the Gallipoli Campaign.
The deck carries six lanes of motorway (three in each direction), together with two walkways on each side for maintenance
The total length of the bridge is 3,563 m (11,690 ft) and together with the approach viaducts the length reaches 4,608 m (15,118 ft), main span of 2,023 m (6,637 ft)
The height of the bridge's two towers is 318 m (1,043 ft), the bridge is the sixth tallest bridge in the world
Construction start 2017, construction end 26.02.2022
- 60 days from now, January 10, 2027, 1915 Çanakkale Bridge celebrate 20th Mercury age
- 98 days from now, February 17, 2027, 1915 Çanakkale Bridge celebrate 8th Venus age
- 127 days from now, March 18, 2027, 1915 Çanakkale Bridge celebrate 5th birthday
127 days from now, March 18, 2027, 1915 Çanakkale Bridge celebrate exactly 60 months - 148 days from now, April 8, 2027, 1915 Çanakkale Bridge celebrate 21st Mercury age
- 236 days from now, July 5, 2027, 1915 Çanakkale Bridge celebrate 22nd Mercury age
- 300 days from now, September 8, 2027, 1915 Çanakkale Bridge celebrate exactly 2,000 days
- 310 days from now, September 17, 2027, 1915 Çanakkale Bridge celebrate 6th half birthday
- 323 days from now, September 30, 2027, 1915 Çanakkale Bridge celebrate 9th Venus age
- 324 days from now, October 1, 2027, 1915 Çanakkale Bridge celebrate 23rd Mercury age
- 361 days from now, November 7, 2027, 1915 Çanakkale Bridge celebrate 3rd Mars age