1915 Çanakkale Bridge
Basic information
Road suspension bridge in the province of Çanakkale in northwestern Turkey.
The number 1915 in the name, the height of intersection point of main cable (318 m),] and the groundbreaking date (18 March) are related to the Ottoman naval victory on 18 March 1915 during the naval operations in the Gallipoli Campaign.
The deck carries six lanes of motorway (three in each direction), together with two walkways on each side for maintenance
The total length of the bridge is 3,563 m (11,690 ft) and together with the approach viaducts the length reaches 4,608 m (15,118 ft), main span of 2,023 m (6,637 ft)
The height of the bridge's two towers is 318 m (1,043 ft), the bridge is the sixth tallest bridge in the world
Construction start 2017, construction end 26.02.2022
- 82 days from now, January 10, 2027, 1915 Çanakkale Bridge celebrate 20th Mercury age
- 120 days from now, February 17, 2027, 1915 Çanakkale Bridge celebrate 8th Venus age
- 149 days from now, March 18, 2027, 1915 Çanakkale Bridge celebrate 5th birthday
149 days from now, March 18, 2027, 1915 Çanakkale Bridge celebrate exactly 60 months - 170 days from now, April 8, 2027, 1915 Çanakkale Bridge celebrate 21st Mercury age
- 258 days from now, July 5, 2027, 1915 Çanakkale Bridge celebrate 22nd Mercury age
- 323 days from now, September 8, 2027, 1915 Çanakkale Bridge celebrate exactly 2,000 days
- 332 days from now, September 17, 2027, 1915 Çanakkale Bridge celebrate 6th half birthday
- 345 days from now, September 30, 2027, 1915 Çanakkale Bridge celebrate 9th Venus age
- 346 days from now, October 1, 2027, 1915 Çanakkale Bridge celebrate 23rd Mercury age